PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Clearing up the site Facing West (800x600).jpg Installing rebar footings at Elev. 7-Stair -4,5 Facing North (800x600).jpg Job site Facing South (800x600).jpg Moving the rebar Facing West (800x600).jpg Rebar mats at Elev. 1,2,3 2nd Floor Facing South-West (800x600).jpg Tying up the rebar mats at Elev. 1,2,3 2nd Floor Facing South-East (800x600).jpg
Previous pageNext page Installing rebar footings at Elev. 7-Stair -4,5 Facing North (800x600)
Installing rebar footings at Elev. 7-Stair -4,5 Facing North (800x600)